Livv Housing Group has a stock of approximately 13,000 homes and whilst their main area of operation is currently Knowsley, services may also be required within the wider Liverpool City Region. In addition to this, the Group also has some outlying stock in the broader North West...
Wigan Council would like to appoint a Contractor to carry out the refurbishment of Leigh Market Hall. The scope of the scheme includes: infrastructure improvements, particularly to the roof, heating, lighting and ventilation; introduction of public toilets; a new entrance from...
The Borough Council of Bolton ("the Authority") is seeking a suitably qualified supplier to develop and potentially deliver a five-lane recreational cricket dome at Ladybridge High School, together with associated landscaping and site works.
This procurement is being conducted...
Cheshire East Council intends to procure a framework to fulfil its Domestic Build Works requirements for disability adaptations. This will assist Cheshire East Council in the completion of works in order to support vulnerable residents to help them to live safely and...
Buyer
Cheshire East Council
Location
Crewe
Deadline
Closes 2 Nov 2026
Value
£4m
Key dates and value
Status
Closed
Submission deadline
16 Oct 2026
Published
8 Sept 2026
Estimated value
£44k
Contract start
1 Feb 2027
Contract end
15 Feb 2027
Location
Cockermouth, North West England
Notice type
UK4
Overview
1.1 The Authority
Cockermouth Town Council is inviting competitive tenders for minor civil works to improve a public footpath section. Engineering drawings and technical specifications were prepared on behalf of the Town Council by Cumberland Council.
1.2 Purpose of Work
The objective is to establish an accessible, surfaced route from Double Mills footbridge to the woodland section behind Dale View, Cockermouth. Currently, this missing link prevents access for pushchairs, wheelchairs, and less-mobile pedestrians.
1.3 Key Project Details
• Design & Standards: Formulated via engineering drawings provided by Cumberland Council.
• Target Start Date: February / March 2027 (Spring 2027) or before.
• Contract Duration: Estimated 2 consecutive weeks.
2.1 Scope of Works
The contractor will provide all plant, labour, and materials to execute the following sequence:
1. Site Establishment: Set up a secure temporary compound near the park entrance at Dale View.
2. Safety Measures: Formally close Footpath No. 223015 to the public for the 2-week duration of works. (Cumberland Council has agreed to meet the costs of this)
3. Excavation: Dig out a ground tray 50mm deep along the path alignment. Retain topsoil and arisings on-site for reuse.
4. Membrane: Supply and lay a heavy-duty geotextile separation membrane along the length of construction.
5. Sub-Base: Supply, lay, and compact a 150mm depth of Type 1 granular sub-base.
6. Surface Course: Supply, lay, and compact a 40mm depth of 0-6mm crushed aggregate to form a smooth, accessible top finish.
7. Alignment Note: The path alignment must run to the right-hand side of the park bench and to the left-hand side of the trees.
8. Tie-ins: Saw cut the existing macadam path at chainage 0m near the Double Mills footbridge to ensure a flush finish. The end chainage must meet completely flush with the existing timber bridge deck.
9. Landscaping: Smooth out and reinstate path edges using the saved arisings and topsoil, then seed with an 80/20 wildflower mix.
2.2 Critical Site Constraints
• Narrow Access: Access to the park area is via a restrictive, narrow road at Dale View. Large commercial HGVs or oversized plant will not physically fit. Bidders must check this access profile prior to pricing.
• Watercourse Proximity: The works run directly alongside the River Cocker.
• Environmental Protection: All materials and plant machinery must remain at least 5 metres away from the watercourse channel on ground with no immediate flooding risk. Absolutely no refuelling, servicing, or greasing is allowed on site. Equipment must be checked for leaks before entering the site.
• Flood Risk Management: Works must be carried out in generally dry conditions. The contractor is required to monitor local water levels and Environment Agency flood alerts prior to and during construction to reduce risk to the workforce.
Free bid checklist
Bid checklist for construction tenders
What to check before you submit a response to a tender like this one.
1Read the specification and every tender document, including clarification answers the buyer has published.
2Check the selection criteria and any pass or fail questions before you start writing.
3Note the evaluation criteria and weightings, and plan the length of each answer around them.
Get the other 10 items, free
CPV codes
45233161 Footpath construction work
How to apply
Tender documents and submissions are handled on the official portal (Find a Tender). Register there to download the documents and submit your response before the deadline.
Upload the tender documents and mytender.io drafts compliant answers from your own past bids, case studies and policies, so your team spends its time improving the bid rather than starting from a blank page.
Never miss construction tenders in North West England
Set up free alerts in the mytender.io tender browser.
Source: Find a Tender. Contains public sector information licensed under the Open Government Licence v3.0. Details may change; always check the original notice before bidding.