Portsmouth International Port - Repairs & Maintenance Support Staff and Ancillary Services
Portsmouth City Council
Key dates and value
Status
Open
Submission deadline
16 Oct 2026
Published
11 Aug 2026
Estimated value
£4m
Contract start
1 Apr 2027
Contract end
31 Mar 2030
Location
Portsmouth, South East England
Notice type
UK3
Buyer type
Local Authority
Overview
Portsmouth International Port (the 'Port'), a directorate of Portsmouth City Council (the 'Council'), is seeking to appoint a Contractor to provide a dedicated core maintenance team and associated gas maintenance services across the Port estate. The contract is expected to have an annual value in the region of £400,000 to £450,000. The contract will be awarded for an initial term of three (3) years, with the option to extend for up to a further two (2) years, up to a maximum total contract term of five (5) years.
The scope of the service includes the provision of a dedicated on-site maintenance team to undertake planned, minor and corrective maintenance activities across the Port estate, together with the provision of gas safety inspections, planned gas maintenance, reactive repairs and an out-of-hours emergency call-out service. The Contractor may also be required to provide quotations for additional works and specialist trades as required. This procurement represents a re-procurement of the Council's existing repairs and maintenance service provision
Background information
Portsmouth International Port
The Port is wholly owned by the Council and is the UK's largest municipal port. The Port is a major UK port, responsible for handling millions of passengers and vital cargo across the globe. With easy access from the motorway and major shipping lanes, the Port is ideally placed for ferries, cruise, and freight.
Within Portsmouth Cruise and Ferry Port, referred to as the port, there are five Roll On/Roll Off berths serving both ferries and cruise ships. The ferries provide regular sailings to France, Spain, and the Channel Islands; the cruise ships attend the port with both full turnaround and cruise calls. Within the year of 2025, the Port welcomed 1.6 million cruise and ferry passengers, 570,000 passenger vehicles, and 190,000 fright units.
The port usually operates during the hours of 0530 to midnight, 7 days a week, 52 weeks of the year. It has bold environmental ambitions to tackle its emissions and carbon footprint and aims to reach carbon zero by 2050. The Port's plans to improve air quality and their carbon footprint can be found under Sustainability and innovation on the Port's website at Sustainability and innovation - Portsmouth Port (portsmouth-port.co.uk).
Further information about the port, including an overview of the facilities, current ferry and cruise schedules, cargo and logistics, etc, can be freely accessed on the Port's website via the weblink Home - Portsmouth Port (portsmouth-port.co.uk)
The Port manages The Camber, which is set close to the harbour entrance and is Portsmouth's oldest commercial docks, comprising of four berths that are available for small vessels that are primarily local fishing boats, small coastal commercial vessels, and private pleasure craft. The Port is also responsible for a significant area of the land in this area. Further information can be found on the Port's website at The Camber - Portsmouth Port (portsmouthport.co.uk).
Future Requirements - Core Team
The successful contractor is to supply a permanent core team of staff to supplement the Port's own directly employed Technical Services Group who carry out repairs and maintenance across the Port's estate. Both teams are directed by the Port's directly employed Maintenance and Facilities Manager to undertake planned, minor, and corrective maintenance.
One member of the core team of staff should act as a working supervisor having a good understanding of the Port's requirement and undertaking day to day liaison with the Port's Maintenance and Facilities Manager.
The core team are on site at the Port between Monday - Friday (excluding bank holidays), between the hours 8:00 - 17:00. Due to the operational requirements and security at the Port consistency of staffing is required and members of the permanent core team of staff should be treated as a dedicated resource.
To cater for the dynamic work requirements, it is envisaged that the contractors' staff will be required to carry out a range of different jobs, which includes a range of trades (this is not an exhaustive list):
• Carpentry
• Plumbing
• Decorations / Painting
• Groundwork
• Horticultural
On occasion the Contractor may be requested by the Port's Maintenance and Facilities Manager to provide a fixed quotation for a particular job or to provide additional trades outside of those listed above.
The Contractor will provide a call out facility to make safe, prevent further damage to property or personnel and to safeguard the public within a maximum of two hours
Commercial Gas Services
The Contractor is to provide and manage an effective programme for annual safety inspections that ensures that all the Port's assets have Commercial Gas Safety Certificates that are less than twelve months old.
The Contractor is to provide a reactive responsive repairs service, which includes outside of the hours of 0800 to 1700 hours Monday to Friday.
The Contractor will carry out the right repairs first time as and when required to maintain the Port's assets.
Contract Scaling
The Port is a dynamic environment and though not guaranteed, may require the contractors to be able to scale up their workforce by up to two thirds of the current core team over the life of the contract, either on a flexible temporary or long-term basis which will impact the value of the contract.
Scope and Specification
The Council requires the provision of Repairs and Maintenance Services across Portsmouth International Port, including Portsmouth Cruise and Ferry Port, The Camber and the Border Control Post. The services will support the ongoing operation, safety and maintenance of the Port's estate and associated assets.
The principal elements of the service include:
• Planned maintenance activities.
• Minor and corrective maintenance repairs.
• Provision of a dedicated on-site core maintenance team.
• Commercial Gas safety inspections, servicing and maintenance.
• Out-of-hours emergency call-out services.
• Provision of additional specialist trades and quoted works as required.
The Contractor will be expected to work collaboratively with the Port's directly employed maintenance personnel and deliver the services in a manner that supports the operational, safety and security requirements of the Port environment.
CPV codes
45261320 Guttering work
45261900 Roof repair and maintenance work
45262100 Scaffolding work
45262310 Reinforced-concrete work
45262320 Screed works
45262321 Floor-screed works
45262330 Concrete repair work
45262340 Grouting work
45262360 Cementing work
45262370 Concrete-coating work
45262500 Masonry and bricklaying work
45262660 Asbestos-removal work
45262700 Building alteration work
45310000 Electrical installation work
45324000 Plasterboard works
45330000 Plumbing and sanitary works
45341000 Erection of railings
45342000 Erection of fencing
45410000 Plastering work
45420000 Joinery and carpentry installation work
45430000 Floor and wall covering work
45440000 Painting and glazing work
45451000 Decoration work
45452000 Exterior cleaning work for buildings
50710000 Repair and maintenance services of electrical and mechanical building installations
50720000 Repair and maintenance services of central heating
50740000 Repair and maintenance services of escalators
50760000 Repair and maintenance of public conveniences
50850000 Repair and maintenance services of furniture
77314000 Grounds maintenance services
77315000 Seeding services
77330000 Floral-display services
77340000 Tree pruning and hedge trimming
About the buyer
Portsmouth City Council has published 115 tender notices since 7 Oct 2023, with a combined advertised value of £593m. 4 of them are currently open.
How to apply
Tender documents and submissions are handled on the official portal (Find a Tender). Register there to download the documents and submit your response before the deadline.
Upload the tender documents and mytender.io drafts compliant answers from your own past bids, case studies and policies, so your team spends its time improving the bid rather than starting from a blank page.
2.1. The Authority invites response to this Invitation to Tender (ITT) from suitably qualified suppliers ("Suppliers") for the provision of a Cycling and Waking route on the Isle of Wight at a set location knows as the Lee Farm and Victoria Recreation Ground sections.
2.2. The...
The nature of the work required is to design, supply, erect, install, inspect, remove, manage H&S regs (but not limited to) of all Warehouse racking, install and certification requirements for Southern Water.
The Council invites you to tender for the Dartford Football Club Roof Cladding Works.
The extent of these works are confined to the replacement of cladding to the external walls and waterproof covering to the roof of the clubhouse.
Full details of the project, including the...
Dover District Council wishes to select and appoint a suitable Contractor for the provision of Replacement Flooring at Eastry Court, Aylesham. The works is anticipated to commence December 2026 and will continue for a period of 4 weeks. For more information about this...
A Contractor is required to facilitate the delivery of a junction upgrade. Specifically, the intersection between Waterloo Road, Old Wokingham Road, and Peacock Lane within Bracknell Forest Council boundary. This is to be converted into a roundabout and is therefore...
Buyer
Wokingham Borough Council
Location
Wokingham
Deadline
Closes 14 Oct 2026
Value
£3.4m
Source: Find a Tender. Contains public sector information licensed under the Open Government Licence v3.0. Details may change; always check the original notice before bidding.