Guildhall - Great Hall Roof H&S Works

The Mayor and Commonalty and Citizens of the City of London

Similar live tenders

Buyer
London Borough of Barnet
Location
London
Deadline
Closes 16 Nov 2026
Value
£60k
Buyer
Environment Agency
Location
London
Deadline
Closes 16 Nov 2026
Value
£45k
Buyer
Places for People
Location
London
Deadline
Closes 18 Nov 2026
Value
£163m

Refurbishment of the Apheresis Suits at Guy's and St Thomas' NHS Foundation Trust.

Buyer
Guy's and St Thomas' NHS Foundation Trust
Location
London
Deadline
Closes 18 Nov 2026
Value
£2.6m

The Science Museum Group (SMG) wishes to establish a contract for the provision of Video Games Exhibition Fit-out services and Graphics at the National Science and Media Museum (NSMM), Bradford. Please see Appendix 2 Specification for more information.

Buyer
Science Museum Group
Location
London
Deadline
Closes 18 Nov 2026
Value
£100k

Key dates and value

Status
Closed
Submission deadline
5 Aug 2026
Published
8 Jul 2026
Estimated value
£2.7m
Contract start
1 Jan 2027
Contract end
26 Feb 2027
Location
City of London, London
Notice type
UK4
Buyer type
Local Authority

Overview

About the Project

The proposed works are comprised of high-level repairs to the Great Hall roof, to include:

  • Refurbishment of the central lantern and fleche
  • Isolated repairs on the Collyweston stone slate roof
  • Repairs and improvements to rainwater discharge
  • High-level masonry repairs and cleaning, to include clerestories, parapets, turrets, pinnacles and tracery
  • turrets, pinnacles and tracery
  • Re-bedding of gable copings with improved details
  • Installation of a new weathervane on the fleche

The Great Hall and the wider Guildhall complex will remain operational throughout the works. The contractor’s compound will be located on the large, paved area immediately north of the Old Library.

The Great Hall is enclosed by ambulatories on all sides, which prevents the use of full-height, ground-supported scaffolding. Consequently, scaffolding to the north and south elevations will need to be cradled from parapet level, while access to the east and west gables will require bridging over the ambulatories and bearing onto adjacent structures. An indicative scaffolding design and methodology have been developed and will be included within the tender documentation.

The Contractor is anticipated to take possession of the site in early October 2026. Works to the lantern and south elevation of the Great Hall must be completed no later than late October 2027, in advance of the annual Lord Mayor’s Show.

About the Great Hall

London’s Guildhall has been at the heart of the City’s government for centuries. The

site has been a centre of civic administration since at least the 12th century, although

there is evidence that a guildhall or meeting place has existed on the site as early as

the Saxon period. It was built on the site of a Roman amphitheatre which dates to 70

AD, the remains of which were rediscovered in 1987, during the construction of the

adjacent art gallery, and are on public display in the gallery’s purpose-built basement

display.

The medieval Guildhall was erected between 1411 and 1440 to serve as

the administrative and ceremonial centre of the City of London. It was built in

Perpendicular Gothic style, to the designs of John Croxton, the master mason

responsible for the structure’s grand stonework. After the Great Fire of London

(1666) destroyed the roof, Sir Christopher Wren and Robert Hooke oversaw repairs,

replacing the fire damaged roof and altering the interior.

The next phase of alterations occurred between 1788-91 under the auspices of

George Dance the Younger, who redesigned the interior and introduced the building’s

striking neoclassical porch. Dance also designed a new façade for the Guildhall

Chapel, which was demolished in 1822 to make way for the Mayor’s and City of

London Court. In 1866-70 Sir Horace Jones undertook major works to restore many

of the building’s lost Gothic elements.

The building suffered extensive damage during the Second World War Blitz and

restoration work was completed in the 1950s under the direction of Sir Giles Gilbert

Scott. Today the Guildhall is a blend of medieval, Georgian, Victorian and post-war

architecture, reflecting its long and dynamic history, and the building remains the

ceremonial and administrative centre of the City of London Corporation.

This procurement will be conducted as a two-stage competitive process for the award of a below-threshold contract under the Procurement Act 2023. The process has been designed as a proportionate competition comprising an initial selection and shortlisting stage followed by an invitation to tender issued to shortlisted suppliers"

This Selection stage tender process will shortlist maximum of six supplers which will be taken foirward to the ITT Stage.

What the buyer wants

  • Roof works and other special trade construction worksCPV 45260000

About the buyer

The Mayor and Commonalty and Citizens of the City of London has published 241 tender notices since 16 Nov 2023, with a combined advertised value of £1.1bn. 53 of them are currently open.

How to apply

Tender documents and submissions are handled on the official portal (Find a Tender). Register there to download the documents and submit your response before the deadline.

View the original notice on Find a Tender

Draft your response with mytender.io

Upload the tender documents and mytender.io drafts compliant answers from your own past bids, case studies and policies, so your team spends its time improving the bid rather than starting from a blank page.

Source: Find a Tender. Contains public sector information licensed under the Open Government Licence v3.0. Details may change; always check the original notice before bidding.