The nature of the work required is to design, supply, erect, install, inspect, remove, manage H&S regs (but not limited to) of all Warehouse racking, install and certification requirements for Southern Water.
Tunbridge Wells Borough Council (TWBC) is looking to procure for Planned Maintenance (PPM), Statutory Compliance, Emergency Call Out, Responsive Repairs and Minor Building Maintenance Works to Council buildings throughout the Borough.
The tender consists of 4 specialist...
Test Valley Borough Council (TVBC) proposes to enter into contract for the supply and install new larger Fuel bulk storage tanks, pumps infrastructure and the council also wishes to seek the added option to install AdBlue bulk storage systems at the two operational sites in...
The United Kingdom Atomic Energy Authority are looking to engage a Supervisory Control And Data Acquisition (SCADA) specialist to develop a new SCADA system in J5 based on the IEC 61850 protocol, replacing the existing SCADA. The 400/33kV substation, the existing control and...
Maidstone Borough Council (MBC) is looking to Procure two Cremators and associated installation works and Removal of Existing Equipment for MBC Vinters Crematorium along with a maintenance package to support the installation.
For more information about this opportunity, please...
Buyer
Maidstone Borough Council
Location
Maidstone
Deadline
Closes 9 Nov 2026
Value
£3.6m
Key dates and value
Status
Closed
Submission deadline
28 Jul 2026
Published
8 Jul 2026
Estimated value
£70k
Contract start
19 Aug 2026
Contract end
18 Dec 2026
Location
Abingdon, South East England
Notice type
UK4
Buyer type
Utilities
Overview
UKFE is inviting bids from the market so it can appoint a suitably qualified supplier to deliver a Crane Concept Design Study, in support of the SPP.
The STEP Prototype Powerplant (SPP) is a programme of work to build, commission and demonstrate fusion power in the UK. The key goal of the project is to operate a powerplant that places net power on the UK grid from fusion energy in the 2040’s. West Burton Power Station, Retford, was announced as the home for STEP (Spherical Tokamak for Energy Production) in October 2022. Staff also work at Culham Science Centre in Abingdon.
Further details on the technical specification are provided in the tender pack, on the UKFE Delta procurement portal.
This contract follows earlier market engagement which demonstrated sufficient capability and interest in the market for a tender exercise to be run.
For more information about this opportunity, please visit the eSourcing portal at:
https://ukfe.delta-esourcing.com/tenders/UK-UK-Abingdon:-Lifting-and-handling-equipment./W5S3379557
To respond to this opportunity, please click here:
https://ukfe.delta-esourcing.com/respond/W5S3379557
CPV codes
42410000 Lifting and handling equipment
42414100 Cranes
42414200 Overhead travelling cranes
42414500 Bridge cranes
42418000 Lifting, handling, loading or unloading machinery
73110000 Research services
About the buyer
UK FUSION ENERGY LTD has published 9 tender notices since 7 Oct 2023, with a combined advertised value of £12.3m. 3 of them are currently open.
How to apply
Tender documents and submissions are handled on the official portal (Find a Tender). Register there to download the documents and submit your response before the deadline.
Upload the tender documents and mytender.io drafts compliant answers from your own past bids, case studies and policies, so your team spends its time improving the bid rather than starting from a blank page.
Source: Find a Tender. Contains public sector information licensed under the Open Government Licence v3.0. Details may change; always check the original notice before bidding.